AyMINE – Technical documentation
Modules
Task, project & quality management
Manager approval with the task report
Why some data can't be deleted
Adminitration of areas, projects, calendars
Region / project / methodology
Change management process in a project
GDPR and record of qualifications
Qualification of user or contact
Right to Manage Qualifications
Task, project & quality management
Administration of the Task Management Module
System rights for the task management module
Methodology and Quality Management systems
What a methodology / QMS consists of
Collaborative Resolution of Multiple Problems
Customer Service Response Generation
Incident and Quality Issue Management
Objects affected by the problem
Problems, Incidents, Helpdesk Tickets
Return project plan by baseline
Sample tasks and methodologies of the area
Effect of the task on the right to modify the attached object
The person responsible for the task
Working procedure – task definition
Objects related to the task pattern
Contacts and directories module (CRM)
Order overview for customer groups
Contacts and directories module (CRM)
System Permissions and CRM Module Settings
Send bulk messages in compliance with GDPR
How to correctly forget a person's details
Unsubscribe and set preferences
for bulk mail
Web management and automation
Receiving a message from the web
Human resources
Personalistics – User Permissions
Human Resources module security
Manage department / division data
Overview of Personnel Information for pracov# Employment Contract
Synchronizing staff and system users
Products, assets and sales
Received order for goods or services
Finance management
Metrics and Measurements
Technical Modules
Sabre plugin module
Enterprise Architect connector
Database link to Enterprise Architect database
Enterprise Architect connector
System Modules
The AyMINE Framework Module
AyMINE — Tips for Mobile Usage
Configure how your system looks and works
Gestures and Keyboard Shortcuts
More about how the system works
Private notes and tags for objects
Overview of Modules and Record Types
Filtering in the list of records
System Management
Securing posts and internal discussions
Additional functions with files
Copying and moving files between objects
Files (documents) linked to the object
Formatted texts in the application
Gateway settings for external messages
IMP gateway settings for email communication
Internet Call Gateway Settings
Quality criteria
Using quality criteria, you can determine and actively monitor whether everything in production or service is in order
Setting and managing quality criteria is a practical fulfillment of the requirements of ISO 9001 – part of metrology as well as other standards. Read more in the separate section on the meaning of QA criteria.
Entering criteria
You enter quality control criteria for products or assets. For products, you can enter them with the flag that they are copied to individual assets.
It makes sense to enter criteria where you will actually track them. They are an active control tool, not a documentation tool. If you want to document qualitative or other product properties, use product properties.
Schedule device inspections
You schedule a device inspection by specifying the task and the period when the inspection is to be performed.
The sample inspection task must be part of a methodology that relates to the area in which the product or product falls.
Example: You want to enter a requirement to inspect a production machine every 3 days. A production machine is an asset belonging to the production area, and the control procedure is part of the production methodology. Therefore:
- The production methodology therefore relates to the production area (In the production setup area, specify which methodologies relate to it)
- The sample inspection task relates to an asset (In the sample inspection task, specify that it relates to general assets)
- You link the sample inspection task to a specific machine
- In the quality criterion for the asset, you select which procedure the inspection is to be performed by).
- You specify with the task how often the inspection is to be performed and who is responsible for it.
The system will automatically create the task and submit the task to a responsible employee for fulfilling the task.
You ask
How to store information that a specific device has been measured and meets the quality criteria.
If the check is outsourced or by an internal testing service, the information is supported by a measurement protocol – most often a file (PDF) that should be stored among the files of the facility (asset) it covers.
There is not necessarily a document – there may be an internal protocol and a record of the check. In particular, a methodological task is created for the asset, which contains a checklist of the checks carried out. The staff member in charge of the checks is given a task to confirm the checks carried out. The detail of the documentation of the check carried out is described by the methodological sample task (see ISO 9001, metrology area).